Astoria-Megler Bridge Project

Project Description: This 3 year project is designed to perform pressure washing and maintenance coating on plate girder spans, deck truss spans, and through truss rocker bents and bearings. This Project includes rivet replacements. Additionally, sealant will be replaced at the existing expansion joints.

Traffic Impacts: Staged Temporary Pedestrian Traffic Routes (TPAR) underneath the bridge near the Maritime Memorial Park and Holiday Inn will be installed during the bridge maintenance work. When the Contractor is performing work on Structure Numbers 07949E and 07949C (Just North of the Astoria Steel Through-Truss Section), a single lane closure during daytime hours Monday through Thursday from 6:00 am to 7:00 pm, and Friday from 6:00 am to 5:00 pm are allowed. When the Contractor is performing work on Structure Number 07949F (Just South of the Astoria Steel Through-Truss Section), a single lane closure during nighttime hours Sunday night through Friday morning from 7:00 pm to 6:00 am are allowed. The Project will begin with daytime lane closures in September, 2021, Expect delays.

Project Website: https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18597

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s